Browse all practice questions for the Certinia PSA Administrator Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Certinia PSA Administrator Practice Exam course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • What can significantly affect the time it takes to reprocess transactions when using the Actuals Verifier?
  • What is the simplest way to report for a specific time period?
  • Which configuration might affect the approval of Timecards?
  • What must be added to configure Permission Controls for timecard entry?
  • Where can you calculate historical or scheduled utilization for an RPG or Resource?
  • Approximately how many Configuration Options are currently available in PSA?
  • What is the method of loading additional Time Periods into the system?
  • Actuals are processed in either Immediate or Scheduled mode based on what?
  • What is the purpose of Field Sets in Project Task and Project Task Assignment?
  • What does "Is Report Master" denote in the utilization calculation?
  • How can you ensure that the different navigation items are available to specific groups in a workspace?
  • What is critical when modifying workspaces for specific user access?
  • What platform is referenced for accessing the articles related to timecard entry?
  • Which of the following can be included in Actuals?
  • What are the steps to correct Actuals in PSA?
  • How should the scheduling of Recalculate Resource and Project Actuals be approached?
  • What effect does setting 'Timecard Entry' to "true" have?
  • In which section do you adjust behavior in expenses?
  • What action ensures that hours planned on a Resource Request Parent are wiped out when creating an assignment?
  • Where can a user enable new features in the Certinia application?
  • Will an Expense Rate or Limit be enforced if it is not activated?
  • What action must be taken to create an Expense Limit in the Expense Limit/Rate Tab?
  • What should be verified before recalculating actuals for accuracy?
  • What report type should be used when reporting on timecards for specific projects?
  • Where can you find the color settings for resource or project planners?
  • What is the recommended way to resolve a missing package issue in the FF application?
  • Which feature allows for the addition of fields or buttons to page layouts in Certinia?
  • Which feature console capability helps in maintaining help links or field-level help text?
  • Utilization is calculated on what type of record in PSA?
  • What does setting "IsServiceProductLine" to True display to the user?
  • How many Configuration Groups are available in PSA?
  • What is the method to remove the resource swap button?
  • How can you resolve the issue of discrepancies found for a specific Project or Resource?
  • What needs to be done to have more than one auto mileage type of expense rate in PSA Desktop?
  • What was the old name for the Utilization scheduling tool before it was updated?
  • Which PSA report category contains internal and external resources grouped by account?
  • Which feature can change the columns that appear in lists?
  • What feature considers Role, Skill Ratings, Availability, and RPG of a Resource?
  • What type of report does a Project Manager want regarding timecards for projects?
  • What must you select to utilize Miles instead of Kilometers for the Expense Rate record?
  • During the recalculation of Resource and Project Actuals, which Apex job should not be running?
  • What user interface allows you to enter time on behalf of another resource?
  • Where can you schedule Utilization in PSA?
  • What tool is recommended for loading additional time periods into the application?
  • Which tab is used to access the Missing Timecards features in PSA Administration?
  • What must administrators ensure about the 'Permission Control' record?
  • How can you customize an out-of-the-box workspace?
  • Which Permission Set allows for managing skills within PSA?
  • Which resource helps automate assignment recommendations in Certinia PSA?
  • If a new practice is created, what preliminary action is required?
  • Which PSA report type should be utilized for tracking resource utilization effectively?
  • What is a benefit of upgrading to the latest version of Certinia?
  • What setting must be configured to prevent swaps on past dated projects?
  • When are Certinia's PSA product releases typically scheduled?
  • When are holidays carried over to schedules?
  • Where can you find the path to check if packages are installed?
  • If a user cannot edit a column that is normally not editable, what should you check?
  • What is the process to schedule Time Period updates for RPGR?
  • What is essential to enable before applying field-level security permissions?
  • What is the initial step to edit an out-of-the-box Workspace?
  • Where can users find information about new features and release materials?
  • What type of updates can be assigned through the feature console?
  • For which component can editable fields be assigned through Field Sets?
  • What must be adjusted to create a billing report by a specific time period?
  • What is required if you want to give access to a specific workspace for a user?
  • What kind of warning could alert you about issues with timecard approvals?
  • What may prevent the Project Billing Cap feature from functioning correctly?
  • When are Certinia's PSA product releases NOT scheduled to occur?
  • What enables the user to see a detailed view of resource utilization?
  • What is the correct term for activating updates in a development environment before full deployment?
  • What is the first step to check after scheduling a job in PSA?
  • What is one of the specific permissions found within role-based Permission Set Groups?
  • What is the purpose of the Lightning App Builder in relation to PSA Workspaces?
  • What is required to give someone access to a workspace?
  • What is a key characteristic of the Immediate mode in processing actuals?
  • Which tool allows you to enable various features in your Certinia application?
  • What type of report can you generate by adjusting the Time Period filter?
  • How should the work calendar be set up for part-time vs full-time employees?
  • In the Financial Force application, what should be checked if certain features are not functioning?
  • Which engine helps reduce time and effort in finding suitable Resources?
  • What is the primary purpose of enabling a user to enter timecards for someone else?
  • To ensure accurate tracking of actuals in the system, you must include which of the following?
  • Can PSA use role-based Permission Sets/Groups?
  • If you change an existing expense limit or rate, will expenses already entered be automatically updated?
  • What does 'Timecard Ops Edit' refer to?
  • Does the PSA managed package utilize Permission Sets/Groups?
  • Where can setup such as Profile, Permission Set, and Permission Set Groups be managed?
  • How can you give someone access to a PSA Workspace?
  • What is the first step to add color to the Project and Resource Planners?
  • How can you include recommended resources in the PSA Resource Filter?
  • What does the 'Permission Control' record allow administrators to define?
  • What is the best way to find out about new features and release materials in Financial Force?
  • Which report indicates the last calculation of missing timecards?
  • What is the function of the Timecard Ops Edit permission controls in PSA?
  • Which of the following is NOT an example of a role-based Permission Set in PSA?
  • Which is a best practice regarding FF Permission Sets/Groups?
  • What is the first step to enable a user to enter timecards for another user?
  • When recalculating project actuals, which projects are automatically included?
  • Which of the following does "Actuals" include?
  • When creating an Expense Rate, what must you do for it to take effect?
  • What configuration allows users to enter time only on task lines in PSA?
  • When adjusting the time period on reports, which method should be used?
  • Which permissions are required to access and use Certinia Lightning components?
  • What two options are available for actuals in PSA?
  • Is Report Master is used to separate which types of records?
  • What option must you select for the Expense Limit or rate to apply to children of each Region, Practice, or Group?
  • What could happen if the picklist values are not the same on both the Expense Limit/Rate object and the Expense object?
  • Who is identified as the 'User' in the context of enabling timecard entry?
  • If a managed package is present, which Apex classes can be secured?
  • During actuals recalculation, what happens to PSA regarding record creation?
  • What should not exceed one in the RPG creation process?
  • What is a primary benefit of using a Child utilization summary record in PSA?
  • What is the method to add a Time Entry component?
  • What is required before activating new features in the Certinia application?
  • Which aspect of resource management is handled by Intelligent Staffing?
  • How can Sue get reporting for specific time periods?
  • What can be modified in the feature console besides adding fields?
  • What jobs cannot be scheduled under the PSA Administration tab?
  • Which are common configuration groups used in PSA?
  • What must be set up to begin creating PSA Opportunities and Projects?
  • Which of the following is NOT a requirement for enabling timecard entries?
  • What could cause a user to see an insufficient access message when accessing the planner?
  • If a PSA wants to create a record during actuals recalculation, what occurs?
  • In Salesforce, what is the term for the access given to methods declared as webservice?
  • What must be done to allow a user to edit a column that is not editable?
  • What setting must be adjusted to allow a user to enter timecards?
  • Which object defines hours to be worked on a holiday typically set to zero?
  • Is it recommended to recalculate Resource and Project Actuals during normal business hours?
  • Where should you check for missing timecards in PSA?
  • How are columns modified for a list view in Certinia PSA?
  • Where can new features be enabled in the Financial Force application?
  • If a holiday grants no hours worked, how much is typically allocated?
  • What could cause a user to receive dashboard errors?
  • What should be noted when creating a project without using a template?
  • What will happen if an expense limit or rate is left inactive?
  • When configuring permission controls, who does ‘User’ specifically represent?
  • How can PSA be configured to display only assigned tasks in the Timecard?
  • What tool can verify the correctness of Actuals in PSA?
  • What does Certinia recommend before deleting all actuals and recalculating them?
  • How can Bill create a billing report by period?
  • What allows you to add editable columns to the task grid in Project Task Gantt?
  • PSA tracks actuals by incrementing values by specified amounts in each what?
  • What is the first step to take when creating a new practice?
  • What allows for assigning permissions to edit timecards and expenses after approval but before the billing event is released?
  • To save changes after modifying the Check For Previous Week Timecards field, what should you do?
  • What is the method for opting into push updates?
  • How can you remove the Resource Swap button from the interface?
  • How do you give two groups access to different navigation items in workspaces?
  • What is required to calculate utilization for a parent utilization calculation record?
  • Which steps may be included in the enablement process for new features?
  • How can you schedule Backlog in PSA?
  • What setting must be activated to prevent swaps on past dated projects?
  • Is it necessary to complete the User field for Permission Control?
  • In order to accurately track time, which structure is important in PSA?
  • How can you remove the Previous Week Time Entry pop-up on Time Entry?
  • What could be a reason for an error shown in the Dashboard component?
  • What functionality determines whether a single user has permissions for specific tasks in PSA?
  • What must you enter on the record for Actuals to appear?
  • Are PSA Permission Sets/Groups assigned based on user roles?
  • When creating RPG, how many top-level hierarchies are allowed?
  • What is the primary purpose of using Task Assignment in Certinia?
  • What access is needed for a user to view the planner without receiving an insufficient access message?
  • What is required if a user needs to edit timecards in addition to entering them?
  • What advancement allows you to stay updated with the latest versions in the Financial Force application?
  • What should a user do if differences in Actuals are only found for a specific project or resource?
  • What is the first step to deactivate the Previous Week Timecards feature?
  • What needs to be modified to add additional fields to the Create Project from Template screen?
  • What is the method to recalculate Resource and Project Actuals?
  • What actions can be performed within the feature console?
  • What term is used for the collection of numbers related to a resource's timecard, expenses, and utilization?
  • To ensure job is created, where should you check after scheduling Utilization?
  • Can a Project Manager like Manny manage PSA projects and approve resource time cards with the correct permission sets assigned?
  • Which object should be related to the Work Calendar for part-time versus full-time employees?
  • What mode processes actuals in real-time?
  • What indicates that the component on the Dashboard needs to be updated?
  • If the CEO requests reporting on changes made to resource fields, what report should be used?
  • When PSA calculates a summary of capacity demand by role, what is also created?
  • Which aspect of configuration influences how actuals are processed in PSA?
  • How can different groups be granted access to distinct navigation items in Workspaces?
  • If a manager is assigned through a flow but does not receive timecard approvals, what could be a potential issue?
  • How do you opt into push updates for Financial Force?
  • PSA actuals are recorded within what unit of time?
  • If you want to recalculate actuals for anything other than specific Projects or Resources, what should you use?
  • What determines how the PSA Component reacts in configuration?
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy